Taking Dave’s advice I called into my dealer in south east Melbourne today, shook his hand and had a chat about the progress of my order (contract signed 29th April, not showing a build month or as being in production in the Ineos portal). After tapping away meaningfully on his PC he told me he was having connection issues but he could see my order was moving into production (not in production), would be built some time soon. I asked him was he having connection issues right now or on going, he said the last update he had was two weeks ago. When should I expect my Grenadier to arrive I calmly asked, maybe November or December was the reply.
Sick of waiting (be calm and at peace with the world).