I'm starting to think you have this race against the software release in the bag!!Full sand base now done and insulation boards going down.
View attachment 7817422View attachment 7817423View attachment 7817424
I'm starting to think you have this race against the software release in the bag!!Full sand base now done and insulation boards going down.
View attachment 7817422View attachment 7817423View attachment 7817424
My money is on the software update, I have been wrong before though..... just ask my wifeI'm starting to think you have this race against the software release in the bag!!
I think you have missed your way Steve, you should have been in civil engineering construction, you're a born natural.........Flooring all in now, concrete base being poured Monday. View attachment 7817439View attachment 7817440
Just find things like this massively interesting, especially knowing I will be in it soon.I think you have missed your way Steve, you should have been in civil engineering construction, you're a born natural.........
Have you worked out where the beer fridge and coffee machine is going?Just find things like this massively interesting, especially knowing I will be in it soon.
That will be the fun part when we move in, deciding where everything goes.Have you worked out where the beer fridge and coffee machine is going?
Is that a Mercedes-Benz dealer's hand poking out of the rebar in photo 2?Steel down ready for concrete Monday and ducting laid for CCTV and lighting. View attachment 7817531View attachment 7817532View attachment 7817533View attachment 7817534
Somebody has dumped an old Grenadier in the car park next to the build, complete with roof rack etc, that'll be rare!More steel beams going in, roofing and some cladding is now here along with kerbing on one side laid and more electrical cables being run.
A soakaway.what is a continuation tank??
After having calculated everything whilst watching the animation, I think it will be 842,317.51 GBP - ex VAT and not including the premises.May see if we can run a little competition on guess the cost of the final build, whoever is closest wins a prize
I say 842,317.52After having calculated everything whilst watching the animation, I think it will be 842,317.51 GBP - ex VAT and not including the premises.
Apparently, you know something I don't ...I say 842,317.52
an extra penny washer was usedApparently, you know something I don't ...