Hello Steve, I'm a bit further south, down in Sussex. Thanks for your message.If you can help with the following it would be much appreciated;1) Having paid the £450 followed by the £2050 - at what point will the contract be signed. So far have a Feb 2023 build month given.2) Why is the bonnet chequering not an option in the UK but other countries can order it?3) Same for the gullwing rear windows - will they likely make a comback?4) What changes cannot be made prior to signing the contract - i.e paint/engine type etc tks, if you can answer any of those then cracking.