I’m 17000s. I thought that might be a problem. I also think by getting a standard wagon and then adding all kinds of stuff screwed me.
Do we have a list of reservation date, order number, and build date?
And if someone can get a ‘build time’ estimate. I’m figuring under a month. Shipping time is 1-2 months with movement on either side of the ship borne part.
I know that there might be faster times if people bow out, but in reality, INEOS has a horrible record on delivering- and these dates seem to indicate that there might be a lot of vehicles to build.
I sent a fairly nasty email in response to the email from INEOS. They sure implied that reservation holders should see their vehicles this year, or be built this year. IF there are really 7000 reservations, and I have a an April23 build date and they started making them in August, their production is awfully slower than we all think. WIth a 2/22 reservation date, and an 4/24 build date? Am I one of the last reservation holders.